How to order stainless steel from a Chinese mill
Four things make a quotation usable: grade and standard, size, quantity, and destination. Everything else is a follow-up question that costs you a day. Here is the full process, including the parts most suppliers leave until after the deposit.
1. Send a complete specification
| Field | What to state | Why |
|---|---|---|
| Grade | 304L, 316L, 321, 630… | Grade determines availability and price more than anything else |
| Standard | ASTM A312 / A240 / A276, or EN 10216-5 / 10088 | Tolerance and test requirements differ between them |
| Size | OD × wall, thickness × width, or diameter | State units in mm; mixed units cause most quotation errors |
| Quantity | Tonnes, pieces or metres | Mill run versus stock decides the price level |
| Length | Random, fixed, or cut to length | Cutting is a separate cost line |
| Finish | Pickled, bright annealed, 2B, No.4, polished | Finish changes both price and lead time |
| Destination | Port or full address | Decides FOB, CIF or DDP |
2. Minimum order quantity
| Product | Published minimum on our listings | Made-to-order |
|---|---|---|
| Sheet — selected items | 1 kg | 500 kg – 1 t depending on grade and thickness |
| Pipe and tube — selected items | 1 kg – 100 kg | 1 t, or mill run per size and grade |
| Bar — selected items | 1 kg – 100 kg | 1 t, heat lot |
| Coil and plate | 500 kg – 1 t | Full coil or plate lot |
| Copper tube | 100 kg | Machine run |
These are the minimums published on our Alibaba storefront, item by item. The same item can move between columns depending on grade, thickness and whether it comes from standing stock — so treat the table as the starting range, not a promise. What it does show is that a first order with us is not a container order. With 200,000 tonnes on the floor, a trial lot only has to be worth the freight.
3. Samples
| Case | Sample cost | Courier | Credited against the order |
|---|---|---|---|
| Stock size, standard grade | Free | Buyer | Not applicable |
| Custom grade or non-stock size | Charged | Buyer | Yes, on the bulk order |
Every sample ships with its heat number and mill test certificate, so you can send it to a lab or run a PMI check without asking us for paperwork afterwards. If the sample fails your check, we would rather know before the container is loaded.
4. Quotation and payment
Quotation in 1–2 business days for a complete specification. We accept direct T/T or an Alibaba online order paid through Trade Assurance; we do not open letters of credit. A deposit with the balance released against inspection gives you leverage; platform escrow protects the payment, not the specification.
5. Production, inspection, shipment
| Stage | Typical duration |
|---|---|
| Quotation | 1–2 business days for a complete specification |
| Sample dispatch | Confirmed per grade — stock samples move faster than custom |
| Stock sizes | 3–7 days to dispatch |
| Made-to-order | Confirmed at quotation, against the mill schedule |
| Inspection | Booked to finish before the planned shipment date |
| Sea transit to US West Coast | Around 14–25 days depending on port pair |
Questions about ordering
Do you have a container minimum?
No. Published minimums on our listings run from 1 kg on selected sheet, pipe and bar items to 1 t on coil and plate. A part load is more expensive per tonne than a full container, but it removes the risk of a large first order.
Can I combine sizes into one order?
Yes, and on made-to-order quantities it is the cheapest way to reach a mill run — one lot, several sizes, one set of documents.
What documents come with the shipment?
Commercial invoice, packing list, bill of lading, certificate of origin, mill test certificate to EN 10204 3.1, dimensional inspection record, PMI report and the RoHS verification for your product line.
Can you hold stock for a scheduled delivery?
For repeat customers, yes, within the limits of the stock position. Ask before you plan a production run around it.
Do you accept orders through Alibaba?
Yes. Alibaba online orders and Trade Assurance are both accepted, which is often the simplest route for a first order.